The travel on the northern Sichuan-Tibet road in the east Tibet of Kham will encounter another traffic issue.
According to Kanze Tibet Prefecture Traffic authority that the period from 2016 May 16th to 2016 October 10 31st, the road between Bamei (K0+000) to Tagong town (K28+400) will be rebuilt. The traffic on this part of road will be under control.
08:00am to 12:00 at noon; 13:00 to 18:00 is the time that the road is closed for rebuilding; from 12:00pm to 13:00pm, the Bus and small size vehicle is permitted to drive throgh; from 18:00pm to the next 08:00am, all type of vehilce is permitted to drive on the road;
Control post: 3km to the beginning of the road from the two ends
Leave a Reply