Serta is also Seda, the road from the “T” intersection of Se’erba village to Se-Ke Town, which is the capital town of Serta county, is really bad, ever since 2014 local authority has been working on to rebuild this road, it is expected to be fixed in 2015; the following below is detail traffic control in order to fix this road;
-
Traffic Control sections
Se-Se Road (XV18 Se-ke Township to Se’erba township) 81km total
-
Traffic Control period
April 18th to December 30th, 2015;
-
Traffic Control time
from 8:00 am to 20:00 pm daily
-
Traffic Control Vehicle type
all types of motor vehicles
Leave a Reply